A read-only snapshot of how Veglia was made. Every decision was made by a human; every number was checked by AI.
One human architect. A small team of AI collaborators. One shared studio. This is the real record: what we tried, what we dropped, and who decided.
Glenda Macawile-Farook
Founder & Architect. The only human, and the only one who decides.
Human
Kai Keller
Director & Team Lead. Proposals, research, writing.
AI · Claude Opus 5.5
Vero
Coordinator & Release Manager. The repository, the timeline, the handoffs.
AI · Claude Opus 5.5
Bastian Kraus
Finance & DevOps. The numbers, and the no-flattery check.
AI · OpenAI Codex Sol 6
Reo
Deployment Engineer. On call
AI · Claude Sonnet 5.5
Soren
Accessibility & SRE. On call
AI · Claude Fable 5.1
On call: woken when the work needs them. Team titles set by Glenda on Oct 2.
All by Glenda.
Proposes office pods and meeting rooms in a public park.
Notes that glass pods overheat in summer, and suggests timber, shade and walls that open.
Kills the idea herself: unwatched public shelters attract misuse and fall into disrepair. "Who's going to police that? That's why these plans die right away."
Decision No unmonitored public structures.
Sleeping pods for hikers in the Dolomites. Booked online, keyless entry, charging, security monitored by satellite.
A pack of five, within 500 metres, "but make sure they don't see each other… like a pack."
A square of black and grey concrete, camouflaged, with folding timber over a full glass wall. Stays of one night to one week, no more. A checkout checklist with photos; you can't check out until the photos are uploaded.
Checks what already exists. Photo-at-end-of-ride (scooter apps), keyless cabins, satellite internet at huts. The combination for the mountain is new.
An emergency outlet for winter, a beacon bar that pulses in storms, and an emergency supply box on the wall.
The outlet is unlocked all winter; a crew sets up at the start of the season and restocks only when alerted.
A sixth, larger pod for a volunteer keeper, three months at a time, except winter.
Before a winter storm, an experienced volunteer climbs up days before it hits, stocks the pods, lights the beacons, and watches.
Research on incinerating toilets, water from snowmelt and springs, and recycling showers.
A breathing day between bookings.
"We need real numbers."
Asks a research agent for a sourced cost workbook: the Trentino 2026 public price list, helicopter rates, real Alpine bivouac costs, solar yield data for a 2,458 m site.
Finding: concrete means about 66 helicopter flights per pod, and no modern high-altitude bivouac in Italy is built in concrete.
"One pod at a time", and the keeper's pod first, lived in for a full season before any guest arrives.
Names the project Veglia (the vigil). Glenda approves.
Names the studio Mentium Studio (Latin, "of minds").
The full proposal, and the landing-page content with the case of a hiker caught in an early snowstorm, backed by 2025 mountain-rescue figures.
Receives the files for the repository.
Named budget owner.
"What if we make the pod somewhere else and then haul it there?… What is something strong that will not burn?"
A recycled-steel frame, a thin dark skin and stone-wool insulation, all non-combustible.
Re-costs the prefabricated version. Weight drops from about 60 t to 7.5–11 t per pod; helicopter lifts from about 100 to 15–20. Carbon drops from about 15–18 t to about 4–7 t CO₂e per pod. It can be unbolted and flown out, leaving no trace.
Decision Prefabricated, flown up in modules.
"Can we use fire in fireplaces?", then decides against it: "I don't want any other responsibility."
Decision No fire in any pod.
Flame-free heating. Passive-house insulation, the shutters as part of the heating, heated mattress pads, infrared panels, a warm core that keeps water and batteries from freezing, and AI pre-heating before a guest arrives.
Decision The skin is blackened steel.
Decision In a storm, the AI may propose opening one pod as an emergency room, but a human decides first.
Decision Submit within one week.
Decision The toilet is a dry separating toilet; the gas-assisted one "breaks our rule."
Offers a separate solar panel wall beside the pod.
"This is ugly… it's not going to look like a camouflage anymore."
Decision The solar panels become the skin: black glass set flush into the steel on the side walls and roof.
Rebuilt the utility-object models (GLB) after Glenda changed the skin to solar panels.
Glenda and Vero debated the change. Glenda's call stood.
Her first render of the keeper's pod in Homestyler.
Received the utility-object brief and started the project repository.
Bastian Kraus (AI) drew five plan stages of the keeper's pod, directed by Glenda.





Decision The beacon is amber; the tank goes under the bed.
Generated mood boards with Homestyler's AI mood board tool.
Built the landing page from Glenda's drawings and renders.
Decision Renamed the group of pods "a watch of six" (Kai's suggestion, Glenda's decision).
Independent budget review, no flattery. Keeper's pod €250–550k, each hiker pod €135–250k, the watch of six €0.9–1.8 million, running cost €50–120k a year, all before VAT. Up from Kai's €0.66–1.19 million.
Catches three of Kai's errors: the custom keeper's capsule was priced as a scaled-up box; a one-foot recess under the bed holds about 850 litres, not the 2,000–3,000 Kai assumed; and two infrared panels could use most of the winter solar on their own. Names the risks: the solar skin and winter power, liftability and anchors, water and the operating model.
Decision Each hiker pod sleeps up to four, in bunk beds.
Updates the landing page to Basti's numbers, labelled as a planning estimate.
Everything is done. Veglia was submitted to AIDA on Oct 3.
The budget is a planning estimate, not a supplier quotation. The solar skin, shell, glazing and helicopter lifts still need quotes.
Every decision here was made by a human. Every number was checked by AI.